Kingdom Holding Company, M&B Benetti shipyard, Italy
Total electrical power 4.474KW
Length: 86mt
Year of construction: from 2010 to 2016
• Complete renewal of the electrical plant with latest technology components.
• Substitution and adaptation of the old and obsolete breakers with new generation ones.
• ABB automatic air circuit breaker maintenance and retrofitting.
Lusben refit, Livorno Shipyard, Italy
Total electrical power 310KW
Length: 49mt
Year of construction: 2015
• Power management system DEIF for the energy and fuel saving and performance optimizing.
• Shore Power Upgrading with insulating transformer and seamless transfer system with generators.
• Complete revision of the emergency system.
Lusben refit shipyard, Livorno Shipyard, Italy
Total electrical power 365KW
Length: 55mt
Year of construction: 2016
• Complete renewal of lighting system on board with installation of latest technology dimmable modules.
• DG Main breakers substitution with new models and replacement of the existing copper busbars.
• Automatic and manual parallel and load sharing system with DEIF devices.
• Bow Thruster switchboard replacement.
Tankoa shipyard, Genoa Shipyard, Italy
Total electrical power 615KW
Length: 70mt
Year of construction: 2015
• Power management system DEIF for the energy and fuel saving and performance optimizing.
• Complete revision of the emergency system.
• Navigation and signaling lights control panels.
Rouvia road yacht design Ltd, Mariveles Shipyard, Philippines
Total electrical power 930KW
Length: 70mt
Year of construction: 2010
• Former Russian Navy Ice Class Conversion in Explorer Yacht.
• Whole electrical plant supply (Main Switchboard, Emergency Switchboard, Electrical Substations Distribution Panels, Transformers, Starter Panels, Electrical Cables).
• Completely self engineered with class approvals and test.
Peri yachts, Antalya Shipyard, Turkey
Total electrical power 160KW
Lunghezza: 38mt
Year of construction: 2017
• Main Switchboard Upgrade with DEIF power management system for the energy and fuel saving and performance optimizing.
• Main genset breakers and distribution retrofitting on Main Switchboard.
• Customized and very intuitive serigraphy.
• Complete revision of the loads subdivision inside the distribution panels.
Keppel Shipyard Co. Ltd. Subic bay Shipyard, Philippines
Total electrical power 7.800KW
Length: 225mt
Year of construction: 2009/2013
• Mara Panamax conversion with addition of belt conveyor system and 4 cranes and integration with Existing Main Switchboard.
• Power management system DEIF for the energy and fuel saving and performance optimizing.
• Completely self engineered with class approvals and test.
Saipem S.p.A. Genoa, Italia
Total electrical power 1700KW
Length: 70mt
Year of construction: 2012
• Automatic and manual parallel and load sharing system with DEIF devices.
• DG Main breakers substitution with new models and replacement of the existing copper busbars.
• Structure of the carpentry completely customized.
Chengxi Shipyard, Jangyin Shipyard, China
Total electrical power 4200KW
Length: 110mt
Year of construction: 2018
• FTU Bulk Irony conversion with addition of belt conveyor system, No. 4 cranes, Bow Thruster and No. 2 Propulsion Motor.
• ComAp system for automatic generators management, synchronization and load sharing.
• Completely self engineered with class approvals and test.
Navigazione Laghi, Arona Shipyard, Italy
Total electrical power 564KW
Length: 33mt
Year of construction: 2020
• M/V Topazio Conversion with addition of Hybrid battery system integrated with diesel generators.
• Automatic and manual parallel and load sharing system with DEIF devices.
• Completely self engineered with class approvals and test.
• Navigation and signaling lights control panels.
Navigazione Laghi, Arona Shipyard, Italy
Total electrical power 160KW
Length: 45mt
Year of construction: 2020
• M/V San Cristoforo Conversion with addition of Hybrid battery system integrated with diesel generators.
• Supply of Main Switchboard, Motor Control Center, Shore connection panels.
• Completely self engineered with class approvals and test.
• Structure of the carpentry completely customized.
Cosco Shipyard, Guangzhou Shipyard, China
Total electrical power 8.200KW
Length: 254mt
Year of construction: 2020
• Panamax M/V Niki Conversion with addition of belt conveyor system, No. 4 cranes, Medium Voltage Bow Thruster and integration with Existing Main Switchboard.
• Power management system ComAp for the energy and fuel saving and performance optimizing.
• Supply of a Step-Up Medium Voltage Transformer 440-3300Vac 2500kVA
• Completely self engineered with class approvals and test.
Chantier Naval de Marseille, Marseille Shipyard, France
Total electrical power 1800KW
Length: 272mt
Year of construction: 2017
• Upgrade Emergency system with addition of new Auxiliary Diesel Generator for management optimization of comfort loads on board.
Completely self engineered with class approvals and test.
• Structure of the carpentry completely customized.
Chantier Naval de Marseille, Marseille Shipyard, France
Total electrical power 280KW
Length: 157mt
Year of construction: 2019
• Upgrade Engine Room Ventilation system with addition of Variable Frequency Drives and new Motor Control Centers.
• Completely self engineered with class approvals and test.
• Structure of the carpentry completely customized.
Chantier Naval de Marseille, Marseille Shipyard, France
Total electrical power 820KW
Length: 88mt
Year of construction: 2020
• Whole electrical switchboards supply (Main Switchboard, Emergency Switchboard, Electrical Substations Distribution Panels, Starter Panels).
• Automatic and manual parallel and load sharing system with DEIF devices.
• Domotic system for Hotel service on board.
• Completely self engineered with class approvals and test.
• Upgrade with addition of Hybrid battery system integrated with diesel generators.
Our know-how and the will to get involved and always grow up permits us to face up any kind of project need you may have, both in industrial and marine fields.